Best Major Site Plans

-

PRE-APPLICATION MEETING (OPTIONAL)

It is strongly advocated the proprietor or applicant timetable a pre-Application assembly earlier than filing a website plan application. County Pre-Application techniques may be determined here. A Technical Review Committee (TRC) assembly is scheduled after the first submission feedback is acquired. This assembly is to be had to speak about any feedback the applicant needs to have an explanation or talk in detail. Please see TRC Meeting Dates to decide the date of the assembly primarily based totally on the popularity of the application. Buy Valium Online

STEP 1:  COUNTY COMPLETENESS REVIEW

This evaluation is needed previous to the first submission of a website plan to Community Development.  You will want the subsequent on the way to put up for Minimum Submission Review:

Minimum Submission Review Application

Two (2) copies of the Major Site Plan Checklist or Code of Development Checklist

Two (2) copies of the Site Plan

Other substances as decided for the duration of the Pre-Application Meeting (if assembly became held)

STEP 2: SUBMISSION OF SITE PLAN

Our purpose is to approve web website online plans after evaluations; however, the wide variety of evaluations can be extra if branch feedback isn’t addressed previous to submission.   The County will offer written evaluation feedback to the applicant and proprietor after every evaluation. After the primary evaluation, a Technical Review Meeting may be held. This assembly offers the applicant the possibility to fulfill with reviewers to speak about acquired feedback. A resubmission rate is charged for any evaluation required past the 2 evaluations & signature sets.  Required submission substances are indexed for every submission.

  1. 1st Submission

Land Development Application with unique signatures

Application Fee

Fauquier County Acceptance letter

  1. second Submission. Note: 

The second submission should be submitted inside 35 days of the TRC assembly. Two 30-day extensions can be given with the aid of using the request. Submissions are now no longer assembly the cut-off date requires an extra $two hundred submitting fee.

A remark reaction letter addressing every assessment agency’s remarks

Revised plans with modifications highlighted on every copy (the range of copies supplied have to same as the range of assessment organizations commenting, plus 2 extra copies.)

  1. third & Subsequent Submissions

The third and next submissions should be submitted inside 21 days of receiving remarks from the County.   One 30-day extension can be given with the aid of using a request.   Submissions are now no longer assembly the cut-off date requires an extra $two hundred submitting fee.

$six hundred Flat Fee

A remark reaction letter addressing every assessment agency’s remarks

STEP 3: RELEASE OF SITE PLAN

Site paintings cannot start and Building Permits cannot be permitted till the Site Plan is RELEASED.  Steps important for the launch of a web website online plan are:

Approval and Recordation of any Easements required with the aid of using the web website online plan.

Approval and posting of a Bond and Execution of required Developer Agreements, and affirmation of water and/or sewer upgrades being bonded with the carrier provider.

Approval of the Land Disturbing Permit

STEP 4: AS-BUILT PROCESS

An As-Built Plan displaying all bodily upgrades at the web website online, such as landscaping, has to be submitted at least 10 days previous to the request for any Certificates of Occupancy.

An As-Built Plan for the Stormwater Management Facilities and an SWM/BMP Agreement will be submitted and permitted previous to any request for Bond Reduction or Bond Release.

 

Share this article

Recent posts

Popular categories

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Recent comments